ACC Latest Articles

    • September

      14

      2018

    Placing Concrete & Using Optimus

    Place concrete at a 4” – 5” maximum slump o Screed FLAT, this is very important particularly for the Micro Finishes o Bull float with a wooden bull float both directions o Roller Tamp or Jitterbug in both directions o Bull float a second time o Wait until the bleed water has left before you do

    • September

      14

      2018

    Combined Architectural Exposed Aggregate Specification

    1.01 Summary A. Section includes: Exposed Aggregate Concrete produced through the use of a chemical surface retarder to expose the aggregate of a gap graded concrete mix B. Related Sections: Refer to the following sections for related work Section 02200: “Earthwork” Section 03300: “Cast-In-Place Concrete“ Section 05500: “Metal Fabrications” Section: 07900: “Joint Sealants…..you may download

© Copyright 2016-2018 ACCHEMICALS.COM