Altus & Optimus – Vertical and Horizontal Construction Joint Applications
Generally, when specifying chemical retarders on cast-in-place concrete applications there should be references to both the formwork specifications as well as the use and proper application of the retarder specified along with the placing and finishing operations in the concrete sections. This is particularly important if the contractors producing each are not the same. In most cases we would generally recommend generating a separate architectural concrete specification inclusive of all the preparation work, concrete placement and appropriate finishing required to complete the project correctly. Click below for complete guide information.
download: ACC-Construction-Joint-Guidlines